Network optimization and predictive operations

Prediction is rarely the hard part. What decides the payoff is whether the model's actions pass through the same change control, testing and rollback as an engineer's change, because one misconfigured element can take a national network down.

Part of AI for Telecom, Media, Entertainment & Gaming. 7 sources, checked .

Growth in global mobile network data traffic, Q1 2025 to Q1 2026
22%
Growth in global mobile network data traffic, Q1 2025 to Q1 2026
Ericsson, 2026(opens in a new tab)
Voice calls blocked in AT&T's February 2024 nationwide outage, traced by the FCC to one misconfigured network element
92 million
Voice calls blocked in AT&T's February 2024 nationwide outage, traced by the FCC to one misconfigured network element
Federal Communications Commission, Public Safety and Homeland Security Bureau, 2024(opens in a new tab)
Share of network opex spent on energy, GSMA estimate (2019)
20 to 40%
Share of network opex spent on energy, GSMA estimate (2019)
GSMA, 2019(opens in a new tab)

The problem

Traffic keeps growing and its shape is changing. Mobile network data traffic grew 22% between Q1 2025 and Q1 2026, and Ericsson expects total mobile network traffic, including fixed wireless access, to grow about 2.5 times to 515 EB per month by 2031.1 The mix is moving too. In 2025, 43 of 55 service providers analyzed saw uplink grow faster than downlink, and Ericsson notes many networks are not dimensioned for that shift.1 A capacity forecast trained on a downlink-heavy past will under-call the uplink.

The money is in capacity and energy decisions. GSMA puts energy at 20 to 40% of network opex, with radio access and base stations making up much of it.2 Forecasting load by cell and hour decides when to add a carrier, when to put cells to sleep, and when to spend capital. Small forecast errors repeated across tens of thousands of sites become real cost or real congestion.

The risk is in the change, not the forecast. On February 22, 2024, AT&T placed a misconfigured network element into production during a routine night maintenance window. The outage blocked more than 92 million voice calls and more than 25,000 calls to 911, and the FCC cited a lack of peer review, inadequate lab and post-installation testing, and weak controls on core network changes.3 The FCC then urged providers to adopt CSRIC change management practices, including testing before and after changes and documented back-out plans.4

AI earns its place by shortening the loop from telemetry to action. In a 2026 network slicing trial at a Formula 1 race, SoftBank found that in some cases, by the time an automated optimization would have triggered, the moment had already passed, and that per-slice SLA management only works once monitoring keeps pace with the network.1 In Europe, AI used as a safety component in operating critical digital infrastructure is classed as high-risk under the AI Act.6

What we build

  1. 01

    Cell-level traffic and capacity forecasting

    Forecasts uplink and downlink separately by cell, hour and service, and feeds capacity plans, carrier adds and spectrum decisions. Scenario runs cover stadium events, holidays and new device launches.

  2. 02

    Fault prediction and alarm correlation

    Groups alarm floods into incidents, flags degradation from KPI drift before customers call, and ranks probable root causes for the NOC engineer to confirm.

  3. 03

    Energy-aware cell sleep scheduling

    Predicts low-load windows and proposes cell and carrier shutdowns, with hard limits on coverage, accessibility and drop-rate KPIs that pull the cell back on automatically.

  4. 04

    Change risk scoring

    Checks every planned change, human or automated, against design rules and outage history before the maintenance window, and routes risky ones to peer review with a tested back-out plan.

  5. 05

    Event and slice assurance

    Per-minute monitoring for venues and network slices, with closed-loop parameter adjustments allowed only inside bounds your engineers have approved in advance.

Where it goes wrong

The failure modes we design against from the first week, and the control for each.

  • Automation that skips change control

    An optimizer that pushes parameters is another source of network changes, and the AT&T outage showed what one unchecked change can do.3 Give every automated action a change record, pre-checks, staged rollout and automatic rollback, and require peer review for anything outside pre-approved bounds, as the CSRIC practices describe.4

  • Forecasts trained on yesterday's traffic mix

    Uplink is growing faster than downlink at most operators Ericsson analyzed, so models fit to history will under-forecast it.1 Forecast each direction separately, backtest monthly against actuals, and alert on drift by region and device class.

  • Recovery that becomes a second outage

    AT&T rolled back the bad change in about two hours, but full restoration took at least 12 because device registration systems were overwhelmed by re-registration requests.3 Model and rehearse the recovery path, including throttled reattach, not just the failure.

  • Auto-remediation that hides a reportable outage

    Wireless providers must notify the FCC within 120 minutes of discovering an outage of at least 30 minutes that potentially affects 900,000 user minutes.5 Compute outage impact inside the remediation tooling so a self-healing event never stops the reporting clock silently.

Rules that apply

  • FCC network outage reporting, 47 CFR 4.9

    Primary text on ecfr.gov(opens in a new tab)

    Wireless providers must notify the FCC within 120 minutes of qualifying outages, including those affecting 911 special facilities, and file an initial report within 72 hours and a final report within 30 days. The rule does not care whether a person or an automated system caused the outage.

  • FCC Public Notice DA 24-1166 (CSRIC best practices)

    Primary text on docs.fcc.gov(opens in a new tab)

    The FCC's public safety bureau encourages providers to apply CSRIC change management and network oversight practices: planned integration of new elements, testing before and after changes, back-out plans and peer or management review.

  • AI used as a safety component in managing and operating critical digital infrastructure is listed as high-risk, and high-risk systems must be designed so people can oversee them and stop them in a safe state.

How to measure it

  • Forecast error by cell and traffic direction at the planning horizon
  • Mean time to detect and mean time to restore, before and after deployment
  • Share of automated changes with a change record, pre-check and tested rollback
  • Energy saved per site with no breach of coverage or drop-rate guardrails
  • Time from outage start to FCC notification for reportable events

Questions buyers ask

Where should a carrier start with AI in network operations?

Start where the data is already clean and the action is reversible: alarm correlation and traffic forecasting. Both use telemetry you already collect, both produce recommendations an engineer can check, and both have a clear baseline to beat. Move to closed-loop actions such as energy saving or parameter tuning only after the forecasts have held up against actuals for a few months and the rollback path has been tested.

Can AI make network changes without a human approving each one?

Yes, inside limits. Define a set of low-risk, pre-approved actions with hard bounds, such as sleeping a cell when load is under a threshold and waking it when KPIs slip. Anything outside those bounds goes to an engineer with a change record and a back-out plan. Log every automated action so it can be audited, and keep a way to stop the system and return to a safe state.

How do we prove an AI forecast beats our current planning process?

Run both side by side on held-out months and compare error at the horizon where decisions are made, usually weeks to quarters ahead for capacity. Score uplink and downlink separately and break results out by region and site type. Then trace the difference to decisions: carriers deferred, congestion hours avoided, energy saved. A better error score that changes no decision is not worth deploying.

Sources

Every figure on this page comes from the sources below. We checked each link on .

  1. 1.Ericsson Mobility Report June 2026(opens in a new tab)Ericsson, June 2026 · ericsson.com
  2. 2.Energy Efficiency: An Overview(opens in a new tab)GSMA, May 8, 2019 · gsma.com
  3. 3.February 22, 2024 AT&T Mobility Network Outage: Report and Findings(opens in a new tab)Federal Communications Commission, Public Safety and Homeland Security Bureau, July 22, 2024 · docs.fcc.gov
  4. 4.Public Safety and Homeland Security Bureau Encourages Communications Service Providers to Implement Important Network Reliability Best Practices (DA 24-1166)(opens in a new tab)Federal Communications Commission, November 20, 2024 · docs.fcc.gov
  5. 5.47 CFR 4.9: Outage reporting requirements, threshold criteria(opens in a new tab)Electronic Code of Federal Regulations, 2026 · ecfr.gov
  6. 6.AI Act, Annex III: High-risk AI systems referred to in Article 6(2)(opens in a new tab)European Commission, AI Act Service Desk, 2024 · ai-act-service-desk.ec.europa.eu
  7. 7.AI Act, Article 14: Human oversight(opens in a new tab)European Commission, AI Act Service Desk, 2024 · ai-act-service-desk.ec.europa.eu