Predictive maintenance

Failure prediction is easy to demo and hard to cash in: the value comes from changing which asset a crew works on next week, and that only happens when the alert arrives in the work management system with evidence an engineer accepts. Because real failures are rare, you judge the model on confirmed defects found at inspection, not on a handful of past failures.

Part of AI for Utilities & Energy. 6 sources, checked .

Weighted equivalent forced outage rate for North American conventional generation in 2025, above historical norms of 7 to 8% (NERC)
9.2%
Weighted equivalent forced outage rate for North American conventional generation in 2025, above historical norms of 7 to 8% (NERC)
North American Electric Reliability Corporation (NERC), 2026(opens in a new tab)
Commonly quoted lead time for a large power transformer in 2024, with maximum quotes reaching 60 months (DOE)
36 months
Commonly quoted lead time for a large power transformer in 2024, with maximum quotes reaching 60 months (DOE)
U.S. Department of Energy, 2024(opens in a new tab)
Generators in NERC's 2025 outage follow-up whose outages were prolonged by equipment destruction
16 of 26
Generators in NERC's 2025 outage follow-up whose outages were prolonged by equipment destruction
North American Electric Reliability Corporation (NERC), 2026(opens in a new tab)

The problem

Generating fleets are failing more often. NERC's 2026 State of Reliability found the weighted equivalent forced outage rate for conventional generation rose to 9.2% in 2025, above historical norms of 7 to 8%, with coal and combined-cycle units adding 39.8 TWh and 19.1 TWh of unavailable energy.1 Of 26 generators that answered NERC's follow-up, 16 had equipment destruction severe enough to prolong outages, and six reported turbine blade release or vibration.1

On the wires side, the cost of a missed failure is set by lead time. DOE estimates 90% of U.S. electricity passes through a large power transformer at some point, that these units typically reach end of life around 40 years, and that 36-month lead times are now commonly quoted, with some reaching 60 months.2 NERC also heard from eight generators that supply chain constraints prolonged their 2025 outages.1 An unplanned failure can now mean years on a spare.

DOE's 2024 AI for Energy report notes that many U.S. plants still service equipment on a schedule, and that predictive or risk-informed maintenance could cut labor hours and avoid replacing components with a long remaining useful life.3 For protection systems, NERC PRC-005-6 already allows performance-based maintenance intervals, provided you follow a defined statistical procedure.4 The regulatory path exists; the evidence is usually what is missing.

What AI changes is the ability to read many weak signals together: dissolved gas trends, load and temperature history, vibration, operating cycles and past work orders. The output is a ranked list of assets with reasons, not a dashboard. Getting there means connecting sensors and historians to analytics without opening new paths into operational technology.

What we build

  1. 01

    Transformer health scoring

    A health index and failure-risk ranking from dissolved gas analysis, loading and temperature history, tap changer operations and test records, delivered as recommended inspections with the evidence attached.

  2. 02

    Turbine and rotating equipment anomaly detection

    Models on vibration and process data from generating units that flag developing blade, bearing and seal problems early enough to plan the outage instead of taking it.

  3. 03

    Alerts that become work orders

    Integration with your enterprise asset management system so each alert opens a draft work order with its reasons, a planner approves or rejects it, and the inspection result flows back as a training label.

  4. 04

    Spares and replacement planning

    Risk scores combined with spare inventory and current lead times to decide which long-lead equipment to order now, and where a shared or mobile spare covers the exposure.

  5. 05

    Protection system maintenance analytics

    Segment-level tracking of Countable Events for a performance-based PRC-005 program, flagging segments that approach the 4% threshold before they require an action plan.

Where it goes wrong

The failure modes we design against from the first week, and the control for each.

  • Too few failures to learn from

    Major failures are rare, so a model trained on them overfits to a few cases and extrapolates badly, a failure mode DOE calls out for grid AI.3 Model degradation indicators with engineering limits instead, validate against inspection findings, and report precision on held-out assets.

  • Alerts that never reach the field

    A risk score in a separate dashboard rarely changes the work plan. Put alerts into the work management queue with an owner, measure time from alert to work order and from work order to completion, and retire alerts that planners consistently reject.

  • Stretching maintenance intervals without the required evidence

    PRC-005-6 permits performance-based intervals only through its procedure: segments of at least 60 components, yearly maintenance on at least 5% of each segment, and an action plan if Countable Events reach 4%.4 Use AI to target that work, not to argue for skipping it.

  • New sensors become an attack path into OT

    Condition monitoring adds devices, gateways and vendor connections to control networks. Design them to ISA/IEC 62443 requirements for industrial control systems,5 prefer one-way data flows out of OT, and run vendor platforms in high or medium impact systems through your CIP-013 plan.6

Rules that apply

  • NERC PRC-005-6 (Protection System Maintenance)

    Primary text on nerc.com(opens in a new tab)

    Allows performance-based maintenance intervals only through Attachment A: segments of at least 60 components, yearly maintenance on at least 5% of each segment, and an action plan if Countable Events reach 4%.

  • Defines requirements and processes for securing industrial automation and control systems for asset owners, integrators and product suppliers, which covers how monitoring sensors and edge devices connect to OT networks.

  • NERC CIP-013-2 (Supply Chain Risk Management)

    Primary text on nerc.com(opens in a new tab)

    Requires a plan to identify and assess cyber security risk from vendor products and services procured for high and medium impact BES Cyber Systems, including monitoring platforms installed in them.

How to measure it

  • Forced outage rate and unplanned outage hours on monitored assets compared with unmonitored peers
  • Days of warning between first alert and confirmed defect or failure
  • Alert precision: share of alerts confirmed by inspection
  • Time from alert to work order, and from work order to completion
  • Maintenance cost per asset and components kept in service that a calendar plan would have replaced

Questions buyers ask

What data do you need to start predictive maintenance on transformers?

Start with what you already hold: dissolved gas analysis results, loading and temperature history from SCADA or the historian, nameplate data, test records and past work orders. Online monitors help but are not required for a first risk ranking. The most common gap is work order history that records what was actually found, which is what lets you check whether the model's alerts were right.

Can predictive maintenance replace NERC PRC-005 time-based intervals?

Partly, and only through the standard's own route. PRC-005-6 lets you use performance-based intervals for protection system components if you follow Attachment A, which sets minimum segment sizes, yearly sampling and a 4% Countable Event threshold. AI helps you analyze results and target maintenance inside that program. It does not replace the program or the evidence auditors expect.

How do you know a predictive maintenance model is working before failures are avoided?

Use leading measures. Track how many alerts are confirmed by inspection, how many days of warning each confirmed defect gave, and how quickly alerts turn into completed work. Avoided failures take years to show up in statistics because major failures are rare, so these operational measures are the honest early signal that the model is finding real problems.

Sources

Every figure on this page comes from the sources below. We checked each link on .

  1. 1.2026 State of Reliability: Overview of 2025 Bulk Power System Performance(opens in a new tab)North American Electric Reliability Corporation (NERC), June 24, 2026 · nerc.com
  2. 2.Large Power Transformer Resilience: Report to Congress(opens in a new tab)U.S. Department of Energy, July 2024 · energy.gov
  3. 3.AI for Energy: Opportunities for a Modern Grid and Clean Energy Economy(opens in a new tab)U.S. Department of Energy, April 2024 · energy.gov
  4. 4.PRC-005-6: Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance(opens in a new tab)North American Electric Reliability Corporation (NERC) · nerc.com
  5. 5.ISA/IEC 62443 Series of Standards(opens in a new tab)International Society of Automation (ISA) · isa.org
  6. 6.CIP-013-2: Cyber Security, Supply Chain Risk Management(opens in a new tab)North American Electric Reliability Corporation (NERC) · nerc.com